Readiness
AI Readiness Assessment for Industry Leaders
A method for judging whether your organisation can put AI into production: six dimensions, four plain-language levels, the evidence to ask for and a way to turn the scores into a sequenced plan.
By Dhanesh Mahto, Founder & CEO of Fortiv Solutions · · 30 min read
On this page · 11 sections
Section 01 of 11
AI readiness assessment: what leaders need to decide first
Most boards ask the same question before approving an AI programme: are we ready? Most answers are opinions. An AI readiness assessment replaces the opinion with a repeatable method: define the dimensions that decide whether AI reaches production, describe each level in plain words, ask to see evidence for the level claimed, and turn the result into an order of work.
This guide gives that method. It does not give a benchmark against other companies, and it does not pretend one score fits every industry. A manufacturer, a lender and a hospital group have different binding constraints, yet pilots fail for ordinary, findable reasons: nobody owns the process, the data cannot be reached, governance arrives late, or the budget ends at the demonstration.
The recommendation is to score six dimensions at four levels (not started, emerging, established, embedded), judge each by the weakest evidence rather than the average, close the blocking gaps first, and test one named use case against the same scale. Our AI readiness assessment service runs this method with your teams, and the AI readiness checklist is a lighter version for one process.
Key points
- Score six dimensions: process, data, systems, governance, people, sponsorship.
- Use four levels in plain words, and require evidence for any level claimed.
- Let the weakest dimension set the pace for a pilot; do not average the scores.
- Check a named use case against the same scale before you commit budget to it.
- Turn gaps into a sequence: fix blockers, then pilot, then scale, then re-assess.
- A method is not a benchmark: compare yourself with your own last assessment.
Section 02 of 11
Why AI readiness is misjudged and how it differs by industry
Readiness is usually judged by enthusiasm, vendor demonstrations or the number of experiments running. None of these predicts whether an AI system will be trusted with real work. What does: whether the process has an owner, the data can be reached, someone can approve and stop actions, and the organisation will fund the run after launch.
The binding constraint differs by sector. In manufacturing it is often plant and ERP data that is captured but not joined. In real estate it is CRM discipline and the documents behind a deal. In banking and finance it is model risk and audit trail. In healthcare it is patient data handling and clinical sign-off.
In hospitality it is fragmented property systems and seasonal peaks. In law firms and professional services it is client confidentiality and where knowledge actually lives. For an India-specific view, see our AI readiness guide for Indian enterprises.
01
Readiness is claimed, not evidenced
A leader says the data is good because reports run on time. An assessor asks which fields are blank in the system of record and who corrects them. Reports hide quality problems that an AI layer exposes quickly, mid-pilot, when they are most expensive to fix.
02
Nobody owns the process end to end
Quotations, claims, admissions or work orders cross several teams, each owning a step. AI changes the hand-offs, and a hand-off with no single owner has nobody who can approve the new rule or answer for rising exceptions. Projects stall in committee, not in technology.
03
Data exists but access was never agreed
The information sits in an ERP, a CRM, shared spreadsheets and mailboxes. Each has an owner who has never been asked to allow a read-only integration. The technical connection is the easy part; a documented decision about who may read what, and on whose behalf, is the missing one.
04
Governance is retrofitted after the pilot
Security, legal and risk teams are brought in once a demonstration works, and they ask for audit logs, approval steps and data-residency decisions the design never included. The rework delays launch or is skipped. See private cloud versus on-premise AI for one of those early decisions.
05
Adoption and funding are assumed
The team that will review the AI's output often learns of the project at launch and works around it. A sponsor funds the build but nobody budgets for monitoring, support and the second use case. Both look like technology failures; both are unscored readiness gaps.
How a readiness assessment runs today and with an AI layer behind the assessor
| Area | How it runs today | With an AI layer |
|---|---|---|
| Judging readiness | A steering group discusses confidence and reaches a general view that the organisation is partly ready. | Fixed dimensions and level descriptions are applied to every process in scope, so the same question is asked of every team and answers can be compared over time. |
| Collecting evidence | Assessors request documents by email, wait for owners to find them and read manuals and policies by hand. | An assistant indexes what owners supply, finds the passages relevant to each dimension and lists what is missing, so interviews start from evidence. |
| Scoring | Scores are agreed in a workshop and reflect whoever argued best, with little record of why. | The assistant drafts a rationale linking each proposed level to evidence; the assessor and owner confirm or change it and the reason is recorded. |
| Finding gaps | A slide lists weaknesses by theme, with no link to the use cases they block. | Each gap is tied to the dimension, process and use case it blocks, so it can be sequenced rather than only noted. |
| Choosing a first use case | The loudest sponsor or the most visible demonstration wins. | Candidates are checked against the same dimensions, and the one with the smallest blocking gaps and clearest value goes first. |
Section 03 of 11
The six AI readiness dimensions, levels and evidence to ask for
Each dimension below is something to assess and something to improve. Level descriptions are plain words, not numeric benchmarks, and a level counts only when the evidence is shown. Start with the dimensions that block everything else: ownership, data access and funded sponsorship. Governance, systems and people follow, and can run in parallel. Enterprise AI strategy work sits above these dimensions and decides which processes to assess first.
Start here
Process clarity and ownership
Not started: the process lives in people's heads. Emerging: a map exists but is out of date and ownership is shared. Established: a current map, a named owner with authority to change it and known exceptions. Embedded: the owner reviews performance routinely and approves changes without escalation. See AI in process management.
- Sits in
- The target business process: its map, exception list and owner.
- Measure
- Evidence asked for: the current process map, the named owner, recent changes and who approved them, and a sample of exceptions. Track the share of stages with an owner who can sign off.
Start here
Data access and quality
Not started: data is in files and inboxes with no agreed source. Emerging: a source of truth exists for some fields, with known errors. Established: owners, a data dictionary, documented read-only access and a quality check someone acts on. Embedded: quality is monitored and corrections flow back to the source. See AI in data engineering.
- Sits in
- The systems of record and document stores the process reads and writes.
- Measure
- Evidence: completeness of the fields the use case needs, sample records traced to source, access approvals and the data owner's name. Track how many needed fields have an owner and a working check.
Start here
Sponsorship and funding
Not started: interest, but no named sponsor. Emerging: a sponsor attends reviews but has no budget beyond the pilot. Established: a named executive owner, a funded build and run, and agreed success measures. Embedded: AI is part of the planning cycle and each use case has a business owner who answers for the result.
- Sits in
- Executive committee, finance and the budget owner for the target process.
- Measure
- Evidence: the approval record, budget lines for build and run, and the written success measures. Track whether run cost has a budget holder who is not the project lead.
Next
Systems and integration
Not started: no way for another system to read the data. Emerging: exports and manual extracts only. Established: documented interfaces, a test environment and a change calendar. Embedded: integration is monitored, versioned and its owner is told before upstream systems change. The assessor also checks where the system can run.
- Sits in
- ERP, CRM, MES, property systems, document stores and the identity directory.
- Measure
- Evidence: the interface inventory, test access and the last upstream change and how the integration owner learned of it. Track the systems offering a read path that does not rely on a person.
Next
Governance and risk
Not started: no AI policy. Emerging: a policy exists but is not tied to systems. Established: access control, audit logging, an approval matrix for consequential actions, a data-handling position reflecting the DPDP Act where personal data is involved, and an incident route. Embedded: model and prompt changes follow change control. See AI in compliance.
- Sits in
- Security, legal, risk and compliance teams and each system's access model.
- Measure
- Evidence: the policy, the approval matrix, a sample audit log from an existing system and the incident procedure. Track which consequential actions have a named approver and a log.
Next
People, skills and adoption
Not started: the team has not been told. Emerging: awareness sessions have been held. Established: reviewers are named, trained and given time, and a change lead owns adoption. Embedded: teams raise improvements and reviewers' corrections feed back to the system. Corporate AI training can cover reviewer and manager roles.
- Sits in
- The teams who will review, correct and rely on the AI's output.
- Measure
- Evidence: named reviewers with allocated time, the training record and the change lead's plan. Track reviewer capacity against expected review volume.
Section 04 of 11
How an AI readiness assessment runs, from scoping to re-assessment
An assessment is itself a process, and it fails in familiar ways: scope too wide, evidence too thin, scores nobody can defend and findings that never become a roadmap. Three maps follow: scoping and evidence gathering, scoring with gap analysis and a use-case check, and turning findings into a roadmap with re-assessment. The wider delivery path is in our enterprise AI implementation roadmap.
Process map 01
Scoping and evidence gathering
From a sponsor's question to an evidence set an assessor can score from, without asking each team for the same document twice.
Frame the question and the sponsor
Today
A leader asks whether the organisation is ready for AI. The question is broad and no decision is attached to it.
With the AI layer
The assessor drafts a one-page scope: the decision the assessment informs, the processes, the sponsor and the dimensions to score.
Human checkpoint
The sponsor confirms the decision and signs the scope.
Choose the processes in scope
Today
Everything is included, so nothing is examined in depth, or the most enthusiastic team's process is chosen.
With the AI layer
An assistant summarises candidate processes from planning documents and lists the systems, teams and personal data each touches.
Human checkpoint
The sponsor and process owners agree a short list; exclusions are recorded with the reason.
Name owners for each dimension
Today
IT answers for data, and nobody answers for adoption or funding.
With the AI layer
The assistant maps each dimension to the role usually responsible and proposes names for the sponsor to correct.
Human checkpoint
Each dimension has a named owner who agrees to supply evidence and review the score.
Issue the evidence request
Today
A long, generic questionnaire goes out and the answers are opinions in different formats.
With the AI layer
The assistant drafts a request per owner listing the documents, samples and access that evidence each level, and why.
Human checkpoint
The assessor trims the request and confirms what an owner may withhold.
Collect and index the evidence
Today
Documents arrive by email; versions are unclear and nobody knows what is missing.
With the AI layer
Material goes into a controlled store, is indexed by dimension and checked against the request, listing what is missing or conflicts.
Human checkpoint
The assessor confirms the evidence is enough to score, or records the gaps as findings.
Interview owners against the evidence
Today
Interviews are free conversations, so claims are heard but rarely checked.
With the AI layer
Before each interview the assistant prepares the passages and samples that support or contradict the owner's claims.
Human checkpoint
The owner confirms or corrects the interview notes in writing.
Process map 02
Scoring, gap analysis and the use-case readiness check
From evidence to a defensible level per dimension, gaps tied to what they block and a test of one named use case.
Apply the level descriptions
Today
Scores are numbers with no definition, so two assessors would score the same facts differently.
With the AI layer
The assistant proposes a level per dimension, quoting the evidence and the level description it matches.
Human checkpoint
The assessor accepts, raises or lowers each level and records the reason.
Apply the weakest-evidence rule
Today
Scores are averaged, so a strong data score hides an unowned process.
With the AI layer
The assistant flags dimensions where one sub-area is lower than the rest, so the level reflects the weakest supported evidence.
Human checkpoint
The assessor shows the sponsor which sub-area set each level.
Test scores with the owners
Today
Owners see the result only in the final deck and dispute it, which delays decisions.
With the AI layer
The assistant prepares a note per owner stating the level, the evidence and what would raise it.
Human checkpoint
Each owner accepts the level or supplies new evidence; a dispute goes to the sponsor.
Turn weak scores into gaps
Today
Weaknesses are listed as themes such as data quality, with no action, owner or consequence.
With the AI layer
Each gap is written as a statement: what is missing, who owns the fix, which dimension it lifts and which use case it blocks.
Human checkpoint
The sponsor confirms each owner and whether the gap must close before a pilot.
Run the use-case readiness check
Today
The first use case is chosen by sponsor preference and its readiness is discovered during the build.
With the AI layer
The six dimensions are applied to the named use case: its data, approvals, reviewers and systems, with blocking gaps highlighted.
Human checkpoint
The business owner agrees to proceed, defer or choose another candidate.
Record the decision and rationale
Today
The conclusion is a slide, and the reasoning behind a level is lost within months.
With the AI layer
The assistant compiles the scoring record: levels, evidence references, challenges and decisions.
Human checkpoint
The assessor and sponsor sign the record before it is circulated.
Process map 03
From findings to roadmap and re-assessment
From a list of gaps to a sequenced plan, a fixed-scope pilot and a repeat assessment that shows whether anything moved.
Group gaps by what they unblock
Today
Gaps are ordered by who complains loudest, or by IT's backlog.
With the AI layer
The assistant groups gaps by the use case and dimension they unblock and shows dependencies, such as access approval before integration build.
Human checkpoint
The sponsor and assessor agree which gaps are blockers.
Sequence the work
Today
A roadmap is built from budgets and calendar convenience, with little reference to the findings.
With the AI layer
A draft sequence places blockers first, parallel work next and the pilot after, each step tied to a finding.
Human checkpoint
The executive committee approves the sequence and each step's owner.
Estimate the value and cost of closing each gap
Today
The cost of fixing readiness is ignored, so the pilot business case looks cleaner than it is.
With the AI layer
The assistant compiles effort notes per gap and shows which fixes serve other use cases; the ROI calculator helps frame the value side.
Human checkpoint
Finance and the business owner accept or amend the cost and value logic.
Set the pilot's entry gate
Today
A pilot starts when the budget arrives, whatever the state of the process or data.
With the AI layer
The entry gate is written from the findings: the levels, with evidence, to be reached before release.
Human checkpoint
The sponsor signs the gate and agrees that a miss means waiting or re-scoping.
Track gap closure
Today
Actions sit in a spreadsheet that is read before board meetings.
With the AI layer
The assistant collects status from owners, links new evidence to each gap and shows which dimensions have moved.
Human checkpoint
Each owner confirms closure with evidence; the assessor accepts or reopens the gap.
Re-assess against the same record
Today
A second assessment starts from scratch, and nobody can say whether readiness improved or the questions changed.
With the AI layer
The assistant reuses the scoring record, highlights changed evidence and proposes updated levels with a reason for each movement.
Human checkpoint
The assessor confirms movements and the sponsor records what changes in the plan.
Section 05 of 11
The target reference architecture an AI readiness assessment measures against
Readiness is measured against a target reference architecture: not a product to buy, but the shape a trustworthy AI system takes inside existing software. Each assessed dimension maps to a layer, so a low score traces to a missing capability.
Information flows upward from the systems of record through an access layer into retrieval and models, and out through workflows that end in a person's decision. Decisions flow down as logged actions. Where data must stay in the organisation's own environment, the same shape is deployed through private AI deployment. See also building an AI-native manufacturing enterprise.
Layer 01
People and decision owners
The executives, process owners and reviewers who accept outputs, approve consequential actions and answer for the result.
- Executive sponsor and steering group
- Process owner for each automated process
- Named reviewers and approvers
- Change lead for adoption
Layer 02
Workflow and agent layer
The automation that carries out defined steps, drafts outputs for review and routes exceptions to the right person.
- Task agents with narrow permissions
- Workflow orchestration and queues
- Approval and escalation routing
- Reviewer interface
Layer 03
Knowledge and model layer
Models and retrieval that read approved sources and produce drafts, classifications or forecasts, each with a reference to what was read.
- Retrieval over approved documents
- Document intelligence and extraction
- Forecasting and scoring models
- Prompt and model version registry
- Evaluation sets built from real cases
Layer 04
Governance and control layer
The controls that make the system safe to rely on: who may do what, what was done and how it can be stopped.
- Role-based access control
- Audit log of reads, drafts and actions
- Approval matrix enforcement
- Personal data handling rules
- Incident and stop procedures
Layer 05
Integration and data access layer
The governed connections that let the AI read from source systems and write only what has been permitted.
- Read-only service accounts per system
- APIs and database replicas
- Document and file connectors
- Master data and identifier mapping
- Interface change alerts
Layer 06
Systems of record
The software that holds authoritative data and where consequential actions actually take effect.
- ERP and finance systems
- CRM and sales systems
- Operational systems such as MES, property or hospital systems
- Document management and shared drives
- Identity directory and ticketing
Design principles
01
Read before write
The assessment asks whether a first release can read from source systems without writing back. Read-only exposes data problems safely, and write access is added per action once the approval route is proven.
02
Deterministic rules around model judgement
Thresholds, eligibility and policy are code, not prompts; the model proposes inside those limits. An organisation that cannot state its rules is not ready to automate them, which is why the process dimension comes first.
03
Retrieval from approved sources
The system answers from documents the organisation has approved, shows which it used and says when it found nothing. That needs a maintained document set with owners, so document ownership is assessed.
04
Every action logged
Each read, draft and action is recorded with identity, inputs and approver. If an existing system cannot produce such a log, that is a governance gap to note, not one AI will fix.
05
A person for every consequential action
Anything that moves money, commits the organisation to a customer or affects a patient, tenant or guest passes through a named approver. The approval matrix is written before the build, not discovered during it.
Section 06 of 11
Data readiness for AI: the systems an assessor examines
A readiness assessment samples data; it does not clean it. The assessor examines the systems below to judge whether the target process can be read reliably, who owns each source and how access would be granted. Our manufacturing guide goes further on plant data.
| System | Data the AI layer needs | How it is reached | Watch for |
|---|---|---|---|
| ERP and finance system | Orders, items, suppliers, invoices, ledgers and approvals for the target process. | Documented API, reporting replica or scheduled extract, using a named read-only service account. | Duplicate masters, free text used for structured information and approval limits kept in a spreadsheet. |
| CRM and customer systems | Leads, accounts, interactions, stages, owners and outcomes. | API or export with field-level permissions, plus a view of how records are created and merged. | Optional fields that are mostly blank, stage definitions that differ by team and notes that hold the real status. |
| Operational and domain systems | Production and quality records, property and unit data, patient administration, booking or matter data, by industry. | Vendor interfaces, database access agreed with the system owner or governed exports. | Data captured on paper first and keyed later, timestamps that differ across systems and vendor terms that restrict access. |
| Document stores and shared drives | Policies, contracts, procedures, drawings, forms and reports. | Connector with permissions mirrored, plus an inventory of what is approved for use. | Several versions of one document, no owner, scans with no text and sensitive files in open folders. |
| Spreadsheets and email | The unofficial layer where plans, exceptions and approvals are often really kept. | Assessed by interview and sample; moved into governed systems before automation depends on them. | Logic held in one person's workbook and decisions agreed by email that never reach a system. |
| Identity directory and access management | Users, roles, groups and the approval chain by role. | Directory integration so every AI action ties to a person or a service identity. | Shared logins, stale accounts, roles that do not match job titles and informal approval authority. |
What the integration needs in place
01
Identity for people and for AI
Every action must be attributable to a person or a named service identity. The assessor checks that each source can tell them apart and that shared logins are retired before any integration depends on them.
02
Master data with an owner
Customers, items, suppliers, properties and patients need an identifier that links the systems. Without an owner, records are joined wrongly and the errors look like model mistakes.
03
A stated access method per source
For every source, write down how it is read: interface, replica, export or connector. A source readable only through a person's screen is a finding to fix before it is a use case.
04
Change management for sources
Each source owner agrees to tell the integration owner before a field, a release or a vendor changes. Without that promise, the system fails quietly the first time a column is renamed.
05
Data ownership and permitted use
Someone accountable decides what each dataset may be used for, including personal data under the DPDP Act, and writes it down so reviewers and auditors can see it.
Section 07 of 11
AI governance readiness and who approves what during the assessment
Governance applies twice here. The assessment must itself be handled safely, because evidence includes policies, contracts and sometimes personal data; and governance readiness is one of the six dimensions scored. Our security and governance approach describes how such controls are designed into a build.
Scoped access to evidence
Assessors and the assistant see only what each owner supplies for the scope. Sensitive material is shared in a controlled store, not by email, and access ends when the engagement closes.
Audit trail for scoring
Every proposed level, challenge and final decision is recorded with the reviewer's name and the evidence relied on. A score that cannot be traced to evidence is not accepted.
Personal data minimisation
Samples use masked or minimal records wherever possible. Where personal data is unavoidable, the DPDP Act applies and the organisation's data protection owner decides what may be reviewed.
Confidentiality of findings
Findings describe weaknesses in security and control, so they are shared on a need-to-know basis and held in the organisation's own environment where required.
Human scoring authority
The assistant drafts rationales, but a named assessor owns each level and a named executive owns each dimension. No score is final because a model proposed it.
Versioned method and tool review
Dimensions and level descriptions are versioned, so a movement in score is never confused with a change in the questions. Security reviews where any assessment tool stores data before evidence is loaded.
What the AI may do alone, and what needs a person
| Action | Risk | Control |
|---|---|---|
| Index supplied documents and extract passages relevant to each dimension | Sensitive documents are exposed to the wrong people or kept longer than agreed. | The assistant may do this alone inside the scoped store, with reads logged and the store removed when the engagement ends. |
| Propose a level for a dimension with its rationale | A level is set on thin evidence and later defended as fact. | The assistant drafts; a named assessor confirms or changes the level and records the reason. |
| Finalise a score and share it with the sponsor | An undisputed but wrong score drives a funding decision. | The dimension owner has challenged it, the assessor has signed it and the sponsor receives the evidence reference with it. |
| Mark a gap as a blocker for the pilot | A false blocker delays value, or a missed one lets a pilot start on weak footing. | The assessor proposes; the sponsor and process owner agree, and the decision is logged. |
| Grant a service account read access to a source system | Over-broad access creates a new exposure. | Approved by the system owner and security, limited to the fields needed and logged. |
Note
This guide describes controls to design for and is not legal advice. Your legal and compliance teams decide what the DPDP Act and your sector regulators require of you.
Section 08 of 11
Turning AI readiness scores into a sequenced plan before a pilot
A readiness assessment is the first phase of a delivery path, not a separate exercise. The pilot's entry gate comes directly from the findings. AI consulting can support the phases, and engagement models show how the work is usually structured.
Phase 1
Sponsor alignment and scoping
Agree the decision the assessment informs and the processes in scope.
Activities
- Name the executive sponsor and the owner of each dimension
- Choose the processes and the first candidate use case
- Agree how evidence is shared and where it is held
Exit criteria
- A signed scope with a named sponsor
- An owner for each dimension who has agreed to supply evidence
Phase 2
Evidence gathering and scoring
Reach a defensible level per dimension, with evidence behind each.
Activities
- Issue and collect the evidence requests
- Interview owners against the evidence
- Draft and challenge each level, applying the weakest-evidence rule
- Run the use-case readiness check
Exit criteria
- A level and evidence reference for every dimension
- A scoring record signed by the assessor and the sponsor
Phase 3
Closing the blocking gaps
Fix what stops a pilot, in an order that serves more than one use case.
Activities
- Assign an owner and a measure to each blocking gap
- Document process ownership and exceptions for the target process
- Agree read-only access to the needed systems
- Write the approval matrix and name the reviewers
Exit criteria
- Each blocker closed with evidence or consciously accepted by the sponsor
- Pilot entry gate met for the target use case
Phase 4
Architectural review
Confirm how the target reference architecture fits the existing systems.
Activities
- Map systems, interfaces and identity to the architecture layers
- Decide where the system will run, including private-cloud needs
- Define evaluation cases from real, approved samples
- Agree the scope and measures of the pilot
Exit criteria
- A reviewed architecture signed by IT, security and the process owner
- A fixed pilot scope with an agreed baseline
Phase 5
Fixed-scope production pilot
Put one use case into real operation with people reviewing, and measure it honestly.
Activities
- Build to the agreed scope with read-first access
- Operate with named reviewers on real work
- Log every action, override and exception
- Compare results with the baseline like for like
Exit criteria
- Measured results against baseline, with limits stated
- A sponsor decision to scale, hold or stop
Phase 6
Scaling and re-assessment
Extend to further use cases and show whether readiness has improved.
Activities
- Re-assess the dimensions against the saved record
- Check the next candidate use case against the same scale
- Fund the run: monitoring, support and change control
Exit criteria
- Updated levels with reasons for each movement
- A funded run budget with a named holder
Section 09 of 11
Measuring AI readiness improving and the value of closing a gap
Two things are worth measuring: whether readiness is improving, and what closing a gap is worth. The first is a set of operating measures the dimension owners report; the second is the value of the pilot the gap was blocking, less the cost of fixing it. Use the ROI calculator to frame a business case and bring the baselines below. A dashboard layer can present them to the board.
| Metric | Baseline before go-live | How to measure | Owner |
|---|---|---|---|
| Dimensions at the level required for the target use case | Record the level and evidence reference for each of the six dimensions at the first assessment. | At each re-assessment, count the dimensions that meet the required level and compare with the first record; note which evidence changed. | Executive sponsor |
| Blocking gaps closed with evidence | List every gap marked as a pilot blocker, with its owner, at the end of scoring. | Gaps closed with accepted evidence divided by gaps raised, reported by dimension. | Programme lead for the assessment |
| Process stages with a named owner who can approve change | Walk the target process map and mark each stage with its owner and whether that person can change the rule. | Stages with a confirmed, empowered owner divided by total stages, compared with the baseline. | Process owner |
| Needed data fields with an owner and a working quality check | List the fields the use case needs and note owner, completeness and any current quality check. | Fields with an owner and an active check divided by fields needed; report completeness for those outstanding. | Data owner or chief data officer |
| Source systems with a documented read path | Inventory each source and record how it can be read without a person re-keying data. | Sources with a documented, tested read path divided by sources the use case requires. | Head of IT or enterprise architecture |
| Consequential actions with a named approver and a log | List the actions the system might take that affect money, customers, patients or compliance and record who approves each today. | Actions with a named approver and a working log divided by listed actions. | Head of risk or compliance |
| Run cost with a named budget holder | List monitoring, support, model change and integration upkeep for the target use case and note who pays. | Run cost lines with a budget holder divided by run cost lines identified. | Chief financial officer or sponsor |
| Value of the use case unblocked by closing a gap | Record the pre-pilot cost, time or loss of the target process, using measures defined with the business owner. | Value of the improvement measured in the pilot, less the cost of closing the gap and running the system; note whether other use cases benefit. | Business owner of the use case |
What not to claim
- Do not present a readiness level as a result. It shows a condition holds, not that value has been achieved.
- Do not compare your levels with another organisation's. The method is consistent within your own record, not across companies.
- Do not average dimensions into one readiness score. It hides the weakest area, which decides the outcome.
Section 10 of 11
Use-case readiness checks across industries
A use-case readiness check applies the six dimensions to one candidate before budget is committed. Each example below links to a Fortiv use case so you can see the process concerned; the check itself concerns your data, owners and approvals.
Production scheduling in a discrete manufacturer
The problem. The plan depends on orders, machine availability and material status held in different systems, and the planner keeps the rules in their head.
The approach. The check asks for the written scheduling rules, an owner who can change them, a read path to ERP data and a named planner to approve each schedule.
Dynamic production scheduling for manufacturingCredit memo preparation in financial services
The problem. Analysts assemble statements, bureau data and covenants into a memo, and the credit policy is partly written and partly custom.
The approach. The check tests whether the policy is documented well enough to write rules from, where documents are stored, who approves the memo and what the audit trail must show.
Commercial credit underwriting automationClinical procedure retrieval in a hospital group
The problem. Staff search protocol documents of uncertain version, and the right answer depends on the current approved text.
The approach. The check asks who owns each protocol, whether versions are controlled, what clinical sign-off the source set has and how patient data is kept out.
Hospital clinical SOP retrievalLease abstraction in a real estate portfolio
The problem. Commercial leases hold dates, options and obligations in varied layouts, and the abstract kept in the system is out of date.
The approach. The check looks at where leases are stored, scan quality, who verifies the abstract and which downstream decisions use the fields.
Commercial lease abstractionGuest messaging in a hotel group
The problem. Guests message before and during a stay, and the answers depend on property systems that differ from hotel to hotel.
The approach. The check asks what the property system exposes, who approves guest-facing replies, the escalation path and how guest personal data is handled.
AI hotel guest concierge on WhatsAppContract review in a professional services firm
The problem. Lawyers read the same clause types repeatedly, and the firm's preferred positions are held by a few senior people.
The approach. The check asks whether the playbook is written and owned, how client confidentiality is enforced inside the system and which edits need partner approval.
AI contract review and redlining
Section 11 of 11
AI readiness assessment: frequently asked questions
An AI readiness assessment is a structured review of whether an organisation can put AI into production for a specific process. It scores dimensions such as process ownership, data access, systems, governance, people and sponsorship, asks to see evidence for each level and ends in a sequenced plan. It is a diagnostic for decisions, not a certificate.
You assess AI readiness by choosing the processes in scope, naming an owner for each dimension, collecting evidence, scoring each dimension against written level descriptions and testing one named use case. The result is a list of gaps tied to what they block, plus a sequence of work. Re-assessment then shows whether anything changed.
The main dimensions are process clarity and ownership, data access and quality, systems and integration, governance and risk, people and adoption, and sponsorship and funding. What matters is that each dimension has written level descriptions and evidence requirements, so scores can be defended and compared over time.
Score against written level descriptions, not against other companies. Use four levels (not started, emerging, established, embedded) and give a level only when evidence is shown. Judge each dimension by its weakest supported area. Comparing with your own previous assessment shows whether readiness improved, which is more useful than a peer ranking.
A useful AI readiness checklist covers a named process owner, current process documentation, agreed data sources with access, an approval matrix, audit logging, named reviewers, a funded run budget and a sponsor. Treat it as the starting point for one process. Our process-level checklist is a good place to begin before a fuller assessment.
Data readiness for AI means the fields a use case needs are owned, reachable by a controlled read path, complete enough for the decision and checked by someone who acts on the findings. It does not mean a perfect data lake. It includes a decision on permitted use, including personal data under the DPDP Act.
Possibly, because messy data is common and can be scoped around. Readiness depends on whether the specific fields a use case needs are good enough and owned, not on all data being clean. Pick a use case with a small data footprint and fix its fields first.
Fix the gaps that would stop a pilot reaching real use: no process owner, no agreed read access to the key systems, no approval matrix for consequential actions, no named reviewers and no funded run. Wider data clean-up or organisation-wide training can proceed in parallel.
Yes, you can run a first pass yourself using the six dimensions in this guide, or try our free AI readiness assessment tool. An external assessor adds independence and a challenge to optimistic claims. Many organisations self-assess first, then ask for an independent review.